Aerospace Manufacturing, Coordinated on the Ground in China
Send your CAD/BOM, receive DFM feedback and a benchmark quote, then we manufacture, inspect, and ship your hardware.
48-Hour DFM Review · 5-Axis CNC · PCBA · First-Article Inspection
Start SmallNot ready for a full run? Try a $200-$500 pilot package and benchmark our quality.Direct Factory Pricing, With Engineering Oversight
Our team in Shanghai coordinates manufacturing for collegiate rocketry and CubeSat teams, so you get factory pricing without navigating the supply chain yourself.
Prototyping Cost
$3,000 to $5,000 for a simple bracket when ordering low volumes from Western machine shops.
Factory-direct pricing, typically 50% to 70% less than Western low-volume quotes.
Turnaround Time
10 to 14 weeks of queue time at university and local job shops, often missing launch deadlines.
Parts machined in 10 to 14 days, then shipped express to your lab.
Trust & Oversight
Ordering from unknown overseas suppliers means no way to verify quality, materials, or hold anyone accountable.
Our engineers in Shanghai oversee production and verify every part with inspection reports.
Aerospace Electronics QC
Risky components, hand-soldered joints, and uninspected BGA soldering on student-built boards.
Automated assembly lines with genuine components and X-ray inspection on every board.
From CAD to Hardware in Four Steps
From your CAD workstation to inspected hardware at your lab.
Submit CAD & Specs
Upload your 3D models (.STEP) and 2D GD&T drawings (.PDF) through our secure intake portal. Electronics BOMs ride along inside the .ZIP package with your CAD.
48-Hour DFM & Quote
Our engineers review your design for manufacturability and get you a factory-direct quote.
Precision Machining
Your parts go straight onto 5-axis machining centers or automated SMT assembly lines.
Inspection & Express Shipping
First-article inspection in Shanghai, full QC reports, then express air shipping to you.
Not ready for a full production run?
Start with a $200-$500 pilot package and benchmark our quality.
5-Axis CNC Motor Mounts & Brackets
Al 7075-T651 billet machining, lightweight pocketing, hard anodized Type III finish.
Avionics Flight Computer Prototypes
Turnkey 4-to-8 layer SMT PCBA with full BGA X-Ray inspection and functional test.
Static Test Stand Plates & Foam
Static test stand thrust plates and custom CNC-cut protective case foam.
What Happens After You Submit
Submitting CAD is the start of a guided process, not a leap of faith. Here is every step between your upload and inspected hardware arriving at your lab.
Submit
Your package enters the secure engineering vault.
- You provide
- CAD files, 2D drawings, BOM, target date, and your contact email.
- We do
- Your files land in the secure vault. Access is restricted to the SEDS Sourcing Bridge engineering team only.
- You receive
- Instant confirmation plus your RFQ tracking token (RFQ-PK-2026-XXXX).
Package received
We confirm everything arrived intact.
- You provide
- Nothing more, unless we spot a gap.
- We do
- Completeness check: file integrity, formats, required fields, and export classification screening.
- You receive
- A short checklist of anything missing, so nothing stalls silently.
Engineering review
Fellows at SJTU review your design for manufacturability.
- You provide
- Quick answers to clarifying questions, only if we have any.
- We do
- On-ground engineering fellows review tolerances, wall thicknesses, materials, and assembly approach.
- You receive
- A plain-language summary of what reviewers examined.
DFM questions
Problems get caught before they cost you money.
- You provide
- Fast answers on threads, finishes, fits, and critical dimensions.
- We do
- We flag anything that would fail in machining or assembly and propose fixes with you, not after you.
- You receive
- A concise DFM note list, written for engineers, not sales decks.
Factory quote
Real numbers from verified manufacturing bases.
- You provide
- Your target budget window, if you have one.
- We do
- We solicit factory-direct benchmark quotes across the verified network and sanity-check them against your DFM notes.
- You receive
- A line-item quote with DFM notes and an estimated production timeline.
You approve
Approval GateThe gate that matters most.
No manufacturing starts without your approval.
- You provide
- Written approval of the quote, quantities, and timeline.
- We do
- Nothing moves forward without your sign-off. No spindle time is booked, no material is ordered.
- You receive
- Production authorization confirmation with a locked scope of work.
Production
Your approved design goes to the factory floor.
- You provide
- Your approved package is already in the vault. No further action needed.
- We do
- Spindle time is booked and an on-ground engineer coordinates the run, watching tolerances in person.
- You receive
- Production start notice plus status updates as your parts move through the line.
First article inspection
Measured, not assumed.
- You provide
- Nothing. This stage is entirely on us.
- We do
- Physical first-article inspection on Zeiss CMM in Shanghai. Every critical dimension is verified against your GD&T.
- You receive
- A full inspection report with measured values, not pass/fail stamps.
QC report
Final verification before anything ships.
- You provide
- Approval of the FAI results, or revision requests if something is off.
- We do
- Final QC pass, packing documentation, and shipment preparation.
- You receive
- The complete QC report package for your records and your faculty advisor.
Shipment
Inspected hardware, tracked to your lab.
- You provide
- Shipping address and any customs details for your institution.
- We do
- Express air dispatch with full tracking and export-compliant documentation.
- You receive
- Your hardware, delivered. Track it with the same RFQ token from step one.
Hardware in hand. That is the whole journey, end to end.
Your IP remains yours
- NDA available before you upload anything.
- Vault access is restricted to the SEDS Sourcing Bridge engineering team.
- No manufacturing starts without your written approval.
- Your files are deleted on request when the engagement ends.
